Guides
Short explanations of the documents UK clients ask for, written for the person who has to brief a gang on Monday. They link to the trade samples and the templates. They are not a sign-off.
Briefing and signing a RAMS
A signature on a RAMS is evidence of a briefing, not proof the document is right. What to say on the morning, and when to stop.
CDM 2015 for small contractors
What the Construction (Design and Management) Regulations 2015 actually ask of a small gang, and what a RAMS does not replace.
Is a RAMS a legal requirement?
UK law does not name the document RAMS. It does require a suitable assessment and a plan for construction work. Here is what that means on a small job.
Risk assessment or method statement?
The assessment chooses the controls. The method says when they happen. A RAMS is both, and sites get into trouble when they only have one.
Who should write a RAMS?
The person who will supervise the job should be able to defend every line. Competence is knowledge of this site, not a job title.