General construction RAMS template

Some jobs do not sit neatly under roofing, electrical or the other trades in this library. A general RAMS is still worth more than a blank page, as long as everyone understands it is broader and therefore easier to get wrong.

Use this when the work is small construction or maintenance that mixes several low-complexity tasks. If the job is mostly one trade, start from that trade's template instead. The competent person should delete hazards that do not apply and add the ones that do. A generic sheet that lists everything is not suitable and sufficient.

When to use it. Mixed small works, site set-up, snagging visits, or a trade you cannot find in the list yet. Do not use it unchanged for demolition, structural openings, confined spaces, or live electrical work.

Build a general / other RAMSSee a completed example

What this RAMS has to cover

Sample excerpt

From the general / other base inside RamsBox. It is not a RAMS for a real address until you add the site.

Slips, trips and poor housekeeping. Who might be harmed: Operatives, other people on site, and anyone nearby

  1. Describe the task to the people doing it. Confirm it is not a specialist job that needs a different template.
  2. Walk the area. Note other trades, the public, and anything that looks like asbestos or a fragile surface.
  3. Brief this RAMS and delete or add lines so it matches the walk.

Hazards and controls

Slips, trips and poor housekeeping

Who might be harmed: Operatives, other people on site, and anyone nearby

Initial 6 (Medium) · residual 4 (Low)

  • Keep routes clear, leads along walls, and waste in one place.
  • Light the work area. Cover or mark holes before leaving.

Manual handling of tools and materials

Who might be harmed: Operatives doing the task

Initial 9 (Medium) · residual 4 (Low)

  • Plan the lift. Use a trolley or a second person for awkward loads.
  • Do not carry materials up a ladder.

Work at height, including short-duration access

Who might be harmed: Operatives doing the task

Initial 15 (High) · residual 5 (Medium)

  • Choose a platform before a ladder. If a ladder is used, record why a safer option was not reasonable.
  • Do not work at height alone if the rescue plan needs a second person.

Hand tools, portable electrical equipment and noise

Who might be harmed: Operatives doing the task

Initial 9 (Medium) · residual 4 (Low)

  • Inspect tools and leads. RCD or 110v on a construction supply.
  • Guards stay on. Hearing protection when the tool requires it.

Other contractors, occupants and the public

Who might be harmed: Operatives, other people on site, and anyone nearby

Initial 9 (Medium) · residual 4 (Low)

  • Agree the work area and a route that keeps other people out.
  • Tell the person in charge when the area is unsafe to re-enter.

Hazardous substances, dust and unknown materials

Who might be harmed: Operatives doing the task

Initial 8 (Medium) · residual 4 (Low)

  • Read the safety data sheet. Do not decant chemicals into unmarked bottles.
  • Stop if you suspect asbestos and it is not in the plan.

Relevant legislation and guidance

Only the UK sources kept for this trade. This is not legal advice, and RamsBox is not affiliated with HSE.

Sequence, tickets and PPE

  1. Describe the task to the people doing it. Confirm it is not a specialist job that needs a different template. If the task is specialist (roof, electrical, scaffold, hot work), stop and use that trade's RAMS instead.
  2. Walk the area. Note other trades, the public, and anything that looks like asbestos or a fragile surface. Note other trades, the public, and anything that looks like asbestos or a fragile surface. Do not disturb it.
  3. Brief this RAMS and delete or add lines so it matches the walk. Add or delete lines so this RAMS matches the walk. Do not brief a sequence the site no longer matches.
  4. Set up access, barriers and welfare before the task starts. Access, barriers and welfare are in place before the task starts.
  5. Do the work. Stop if it changes. Stop and tell the supervisor if the task, the people nearby, or the access changes.
  6. Keep the area tidy as you go. Offcuts and leads are cleared as you go so the next step is not done over waste.
  7. Remove waste and tools. Make safe any incomplete work. Waste and tools off site or in the agreed area. Incomplete work is left stable and marked.
  8. Tell the client or principal contractor you are leaving and what remains. Tell the client or principal contractor you are leaving and what remains unfinished.

DRAFT - needs competent person review. A competent person still has to check the draft against the site.

Questions on general / other RAMS

Why is this template more generic?

Because the specific hazard comes from the job you type in, not from a trade default. The draft adds your site hazards as extra rows and marks them for the competent person to confirm. Expect to edit it.

Does CDM apply to a two-day job?

CDM 2015 applies to construction work even when the project is not notifiable. The duties are proportionate. This RAMS does not decide whether a principal contractor or principal designer is needed.

What should we add for a trade that is not listed?

Put the real task in the job description and the odd hazards in the site-hazards box. The free draft will attach them. Read every line before you brief it. Do not leave irrelevant height or hot-works lines in if you are only painting a door.

Is a RAMS a legal requirement for small general jobs?

There is no clause that says the document must be titled RAMS. There is a duty to assess the work and to plan construction work. If someone can be hurt, write the assessment and the method. A short job in an occupied building is a common place to skip it, and a common place someone is hurt.

Who should write a general RAMS?

The person supervising the task. A general template is a starting point precisely because the work varies. If the job is really roofing, electrical work or hot works, use that trade’s template instead of stretching this one.

What is the difference between a risk assessment and a method statement?

The risk assessment lists hazards, who is harmed, and the controls, scored before and after those controls. The method statement is the order of work. HSE’s own templates keep them related but they answer different questions. A RAMS binds them into one pack for the briefing.

When is the general template the wrong starting point?

When the main hazard is a fall from a roof, a live circuit, a scaffold erection, or a naked flame. Those have their own pages and their own legislation. The general draft is for small mixed tasks that do not fit a specialist trade.

AI-assisted draft. A competent person must review it and approve it for the site before use. RamsBox does not provide health and safety advice and is not affiliated with HSE.